    Its is nearly always a transmission bottlenecks that hinders these. How to get all tbat power out of rural areas.

    • nexguy@lemmy.world
      link
      fedilink
      arrow-up
      11
      ·
      10 days ago

      Repurpose combines to drive over the solar panels and harvest the energy. Then pile it up in giant piles near rail roads. From there train it to depots for distribution. Infrastructure is already there!

      • Squizzy@lemmy.world
        link
        fedilink
        arrow-up
        2
        ·
        9 days ago

        Yeah absolutely, no one is saying that isnt an option. But when you capture the production as a single build or consideration simply needing the effort you dont account for the costs of infrastructure to hundreds and thousands of sites and quickly you will see that a lot of these sites are not going to produce enough for it to be a viable option.

        There is load of oil in the ground that we dont take out because it isnt a good investment. This is the same.